The commute to UBC along Broadway isn't that bad once you get past Arbutus. I agree that they can terminate around Granville/Arbutus and then phase in the Arbutus - UBC portion in a decade or two.

Link to comment
Share on other sites

^ and they will. The City has plans to use the Arbutus corridor for streetcar/LRT in the future. And that's one of the reasons why there would be an Arbutus Skytrain station, to meet up with the future LRT/streetcar line - a station transfer point.

Link to comment
Share on other sites

Arbutus to VCC-Clark would probably be 40% of the total cost of the enitre project. Politicians are too keen on completing entire transit projects but yet all the projects get delayed because of the enormous costs.

UBC extension- Phase 1 should be to extend to Arbutus, not all the way to UBC at once

Surrey extension- Phase 1 should be to extend to Guildford, not all the way to 168th avenue at once

Interurban Commuter rail- phase 1 Cloverdale to Scott Road, not all the way to Langley, Abbotsford and Chilliwack at once

Link to comment
Share on other sites

^ While a two-phased construction process would be most logical, there's a problem. For instance, the Millennium Line's 2002 completion was originally to have included a subway from VCC to Granville or Arbutus as well as the Port Moody-Coquitlam Line (now known as the Evergreen Line). The NDP couldn't find the money, so they decided to phase the project...even though a subway to Granville or Arbutus would have cost about $750-million back then in 2000 (compared to ~$1.5-billion today) and the Evergreen Line to Coquitlam would have cost $600-million (now, $1.4-billion). Keep in mind, the entire 23-km Millennium Line that exists today was built for $1.1-billion.

Then the Liberal party was elected, and shelved both extensions. In 2002, the RAV project (now known as the Canada Line) was proposed and by 2005 the project was finally approved by the elected Translink board.

Meanwhile, Translink was also planning to complete the Evergreen Line on its own....but rather than the originally planned SkyTrain, it would have been LRT. The Liberal government saw the incompetence with the Evergreen Line project stepped in, canceled the LRT technology and is now going for a "SkyTrain-like" technology....meaning, in public, it could be something like the Canada Line as the project will go to the tendering phase so it has to be neutral and can't be biased towards Bombardier's ALRT technology that we already use. The problem is that one of the main arguments that was used to cancel LRT in favour of SkyTrain was the lack of transfer for trains and operational and capital cost savings (same trains, train yard, etc.) from Vancouver: if a non-SkyTrain compatible but "SkyTrain-like" system gets approved, the whole argument for not building LRT is lost.

And with the Broadway extension of the Millennium Line, NIMBY's and LRT enthusiasts are dangerously fanning the flames for LRT being built instead of SkyTrain. These people don't ride transit when they claim "overall ambiance" and the "number of stops" is important and that speed is not important. The BC NDP candidate for the Vancouver Point Grey riding was a big advocate for LRT instead of SkyTrain.

I guess my point is: if we build a two-phased SkyTrain project now with intentions to extend it to UBC in the future, we might not get it whether it be a change of government or some asinine fringe group that spreads false information about the differences between LRT and SkyTrain.

Also keep in mind that it's usually cheaper to do things all at once as there are less construction start-up costs. Don't forget about construction cost inflation...the more you wait, the more it costs. We thought the Broadway and Coquitlam extensions of the Millennium Line would be open 3 years after the main Millennium Line opens....boy were we wrong. Unless we signed a contract that says "after phase I is built, you must build us phase II and neither party can cancel without major penalties" then there's no promise that the line/extensions will be built.

The Surrey extension is only 6-kms long, you can do it all at once.

Link to comment
Share on other sites

Wouldn't a Skytrain extension along the Hastings corridor (from Downtown to say Cassiar St., where Burnaby, NE Sector, North Van and SFU traffic all converge) serve more people than an extension all the way to UBC?

Last I heard, it's the busiest traffic corridor in the CoV next only to Central Broadway.

Link to comment
Share on other sites

Wouldn't a Skytrain extension along the Hastings corridor (from Downtown to say Cassiar St., where Burnaby, NE Sector, North Van and SFU traffic all converge) serve more people than an extension all the way to UBC?

Last I heard, it's the busiest traffic corridor in the CoV next only to Central Broadway.

Link to comment
Share on other sites

Not close enough to alleviate most of the traffic on it. It would carry the load of both Hastings St. and Powell St, both of which get very busy.

An LRT or streetcar service would be too slow for those commuting all the way from Coquitlam or North Van, and a bad obstruction to a high traffic area.

Link to comment
Share on other sites

This hasn't been announced yet, but there are plans to build a West Coast Express station at Hastings Park as part of the renewal plan for the park. And of course, the contract to renew the WCE contract is in 2014 and it's quite possible we could see a vastly improved service with the new contract that also serves part of the Hastings corridor.
Link to comment